Flooring installation in the Twin Cities
D1 Construction Group supplies and installs flooring across the Twin Cities metro — luxury vinyl plank, hardwood, tile and carpet, including the subfloor work underneath. We check what is under your floor before we quote, so the number you get is the number you pay.
What we do
Luxury vinyl plank
Waterproof, warm underfoot, and forgiving over concrete. The workhorse for basements and kitchens.
Hardwood
New boards laid tight, or the floor you already have sanded back to bare wood and resealed.
Tile
Bathrooms, entryways, laundry — anywhere that gets wet — set flat on a surface that will not flex.
Carpet
Bedrooms and stairs, stretched properly, with the pad matched to the traffic it will take.
Subfloor and leveling
The part nobody budgets for. We check it before we quote, so the price does not move after demo.
Stairs and transitions
Nosings, landings and thresholds — the details that make a floor look fitted rather than laid.
Recent work
How it goes
-
01
We measure
Room by room, including whatever is under the old floor.
-
02
You choose
Samples on site, in your light, not a showroom's.
-
03
We fit
Furniture moved, old floor out, new floor down, site swept.
Straight answers
Do you move the furniture?
Yes, within reason. Pianos and gun safes we will talk about first.
Can hardwood be saved instead of replaced?
Often. If there is enough thickness left to sand, refinishing costs a fraction of replacing.
What about the subfloor?
We check it before we quote. Soft spots and squeaks are cheaper to fix while the floor is up.
What decides the cost?
The material sets the starting point and the subfloor sets the rest. Because we check what is under your floor before we quote, the number you get is the number you pay.
How long does it take?
A single room is usually a day or two. A whole level runs closer to a week once the trim and transitions are done properly — which is the part that makes it look right.
You might also need
Kitchen remodeling
New floor and new cabinets in one visit beats doing them a year apart and cutting around.
See the detailFire & water restoration
A floor that got wet needs drying and metering before anything new is laid over it.
See the detailPainting & drywall
Baseboards come off with the old floor. Putting them back and repainting is the tidy finish.
See the detailWord of mouth
…damage in my basement, fixed the leak on the roof and repaired the drywall damage. Quick service, great communication, fair pricing. I will call them again in the future!
Yuri was very communicative and helpful. His teammate, Vlad completed a handful of projects quickly and with expert precision. Thank you both!
Yury was a great communicator and Antoni did an outstanding job with our random projects.
Thinking about flooring?
Tell us what you have in mind and we will come and look. No charge, no pressure.